English (United Kingdom)
English (United States)
Start a conversation
Sign in
Start a conversation
Property Tectonics
Lifespan SAP
Category description:
Grounds for EPC cancellation
Error message when a Flat/ Maisonette with an ‘Sheltered Wall’ is specified: ‘DATA INPUT ERROR’ – ‘Invalid Alternative Wall Area (Main Property)’
Alternative EPC formats
English Heritage Listed Buildings Map Search
Dimensions for 1st floor extensions
Flats/Maisonettes - small entrance areas
Secondary heating with storage heating
Fuels for solid fuel fires and room heaters
Solid fuel (wood chips and wood pellets) boilers and stoves
Garages - whether to include
Store Rooms and Utility Rooms - whether to include
Basements - Internal and External measurements
QA information required - April 2010
Sun Room
Lodgement of erroneous EPCs
Mains gas available
"Unknown" wall insulation
Entry of loft insulation
Age band for converted buildings
Underfloor and Radiator heat emitters
Storage Heaters
Suppression of recommendations
Low energy lights (LEL)
Water heating by range cooker
Water heating from community system
Open fireplaces (for heating)
Inclusion of secondary heating systems
Systems with only TRVs
Community heating definition
Micro-CHP
Boiler missing or not working
System build with filled cavity
Cavity Wall Identification
Secondary Glazing removed in summer
Glazed area selection
Window or Door considerations
Use of the alternative wall feature
Entry of more than two extensions
Vertical Extension
Mezzanine Floors
Clarification of inclusion of porches in assessment
Inclusion of porches/ draught lobbies
Conventions for dwellings entirely within roof
Inclusion of rooms within a mansard roof
Inclusion of Roof rooms/ Attics
General measurement conventions
Definition of Flat/ Maisonette
Inclusion of basements
Habitable room count
Sheltered wall length (unheated corridors)
Measurement Precision
Areas to be measured
RdSAP for Dwellings other than 'Existing'
"Unheated corridor" length for flats and maisonettes
Relodging a Domestic (RdSAP) EPC
QA Survey information to be retained from site visit
Single storey "Room In Roof" dwelling
Dwellings with inadequate heating systems
Identifying secondary systems
Identifying main heating systems
Secondary heating systems with Off Peak main heating systems
Entry of extension dimensions
Rise in heating requirement in improved scenario
Large dwellings over 450 m2